An EICO 950A R-C Bridge Part 4c: More wiring, and cleaning up the power supply.

Monday, May 11, 2026 at 11:04:32

The EICO 950A currently on the bench is a mess, and there’s just a lot to remove and re-wire.

eico950a-pscleaned-wereboar.jpg

The power supply area looks a little cleaner.

eico950a-leakageold-wereboar.jpg

eico950a-leakagefixed-wereboar.jpg

The leakage test lamp was mounted in a manner that required you run wire up and around. I moved that so the terminals now pointed towards their connections, and cleaned up the ground enough that it took solder as the original connection just peeled off. That took some doing with scratchy items…

eico950a-eyetubebefore-wereboar.jpg

eico950a-eyetubeafter-wereboar.jpg

The eye tube socket was equally messy, but cleaned up sort of ok.

That’s all for this round, there’s still plenty to do on the bottom, and a few parts poking up through the top that will need to be addressed. Stay tuned!

Next part of this series: Coming soon.
Previous part of this series: https://wereboar.com … hing-is-just-a-mess/
Wrapup and final thoughts: Coming soon.

Top of Page