An EICO 249 VTVM, Part 9a: The rebuild.

Monday, August 10, 2026 at 07:48:00

It’s time to start laying in parts for the EICO 249. I’m kind of following the manual, kind of not. The only place I believe it really matters is all of the switch connections - everything else is just looking at the layout and matching what’s there.

This has been going much better than expected, and I’m up to the last column of instructions (less the AC input, which I’m going to change) in the assembly manual.

Here’s shots of the rebuild…

eico249-rebuildtray1-wereboar.jpg

eico249-rebuildtray2-wereboar.jpg

eico249-rebuildtray3-wereboar.jpg

This might be finished up before too much longer, stay tuned!

Next part of this series: Coming soon.
Previous part of this series: https://wereboar.com … the-function-switch/

References

Manual set: https://wereboar.com … with%20schematic.zip

Youtube Playlist: https://www.youtube. … k&list=PLbV6LYdZISZI

The playlist has more videos scheduled for much later, there are several months difference between here and YouTube.

Top of Page